The primary park has a ability of 200 MW even though Sandrini II features a capacity of 100 MW. The total expense of both tasks were not disclosed on the other hand, throughout construction, more than two hundred staff were being employed. The initiatives are envisioned to find out a https://www.diigo.com/item/note/7waed/kocn?k=aa28888d8811926ac2f27b48693f1a68